Follow steps for a manual Optima run in Pando.


  1. Click on Optima

  2. Select the respective Depot/Plant & Movement (Primary / Secondary)

  3. Upload the file, download valid and invalid rejections

  4. Click on Optimise, check the materials on each Indent and modify if required.

  5. Export the Indents if needed and then click on Indent.